ILSSI (  International Lean Six Sigma Institute, Cambridge  ILSSI.org )   vs ASQ ( American Society of Quality ) verses vs IASSC ( International Association of Six Sigma Certification

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The Body of Knowledge for ILSSI : International Lean Six Sigma Institute:

1     Fundamentals of Process Improvement

 2.   General History of Lean Six Sigma

 3.   Principles of Lean and Six Sigma

 4.   Voice of the Customer, and Business

 5.   Lean Six Sigma Belt Roles

 6.   Defining a Process

 7.   Inputs and Outputs

 8.  The 8 Elements of Waste

 9.   Sustainable Processes

10.   5S

11.  Critical to Quality (CTQs)

12.  SIPOC

13.  Process Mapping

14.  Value Stream Mapping

15.  Flow and Bottle-necks

16.  Single-Piece-Flow

17.  Poka-Yoke (Mistake Proofing)

18.  SMED (Quick Change Over)

19.  PULL and Just-in-Time

20.  Kanban

21.  Visual Management

22.  Standardised Work

23.  Kaizen and Kaizen Events

24.  PDCA  

25.  Root Cause Analysis

26.  Cause & Effect / Fishbone Diagrams

27. Pareto Principle / Pareto Charts

28. Industry 4.0 (Introduction)

29.  Lean Six Sigma Projects

30.  DMAIC basics

31. Define Phase of DMAIC

32. A3 Reports

33. Measure Phase of DMAIC

34. Failure Mode & Effects Analysis (FMEA)

35. Six Sigma Statistics

36. Use of Excel, Minitab or SigmaXL

37. Descriptive Statistics

38. Different Types of Data

39. Normal Distributions & Normality

40. Graphical Analysis

41. Histograms

42. Box Plots

43. Run Charts

42. Measurement System Analysis

44. Precision & Accuracy

45. Bias, Linearity & Stability

46. Gage Repeatability & Reproducibility

47. Variable & Attribute MSA

48.  Process Capability

49. Capability Analysis, Cp, Cpk, Pp, Ppk

50. Long term vs Short term Variation

51. Analyze Phase of DMAIC

52. Y=f(x)

53. Scatter Plots and Correlation

54. Correlation Coefficients

55. Simple Linear Regression

56. Regression Equations

57. Digital Transformation (Introduction)

58. Smart Technology (Introduction)

59. Hypothesis Testing basics

60.  Hypothesis Testing Uses

61.  Practical vs. Statistical Significance

62.  Alpha & Beta Risk

63.  p-values

64.  Types of Hypothesis Test

65.  T-Tests

66.  Designed Experiments

67.  OFAT

68.  Full Factorial Experiments

69.  Full Factorial Designs

70.  Improve Phase of DMAIC

71.  Implementation Plans

72.  Control Phase of DMAIC

73.  Control Plans

74.  Statistical Process Control (SPC)

75.  Data Collection for SPC

76.  Types of Control Charts

77.  Tests for Special Cause Variation

 

As a comparison to ILSSI, shown below explains all the various topics contained in the Bodies of Knowledge of ASQ and the IASSC.  

1. History of continuous improvement

Describe the origins of continuous improvement and its impact on other improvement models. (Remember)

2. Value and foundations of Six Sigma

Describe the value of Six Sigma, its philosophy, history and goals. (Understand)

3. Value and foundations of Lean

Describe the value of Lean, its philosophy, history and goals. (Understand)

4. Integration of Lean and Six Sigma

Describe the relationship between Lean and Six Sigma. (Understand)

5. Business processes and systems

Describe the relationship among various business processes (design, production, purchasing, accounting, sales, etc.) and the impact these relationships can have on business systems. (Understand)

6. Six sigma and Lean applications

Describe how these tools are applied to processes in all types of enterprises: manufacturing, service, transactional, product and process design, innovation, etc. (Understand)

7. Six Sigma projects and kaizen events

Describe how projects and kaizen events are selected, when to use Six Sigma instead of other problem-solving approaches, and the importance of aligning their objectives with organizational goals. (Apply)

8. Six Sigma roles and responsibilities

Describe the roles and responsibilities of Six Sigma participants: black belt, master black belt, green belt, champion, process owners and project sponsors. (Understand)

 

II. Organizational Process Management and Measures

A. Inmpact on stakeholders

Describe the impact Six Sigma projects can have on customers, suppliers and other stakeholders. (Understand)

B. Critical to x (CTx) requirements

Define and describe various CTx requirements (critical to quality (CTQ), cost (CTC), process (CTP), safety (CTS), delivery (CTD), etc.) and the importance of aligning projects with those requirements. (Apply)

Critical to Client

Critical to Quality Tree

C. Benchmarking

Define and distinguish between various types of benchmarking, including best practices, competitive, collaborative, etc. (Apply)

D. Business performance measures

Define and describe various business performance measures, including balanced scorecard, key performance indicators (KPIs), the financial impact of customer loyalty, etc. (Understand)

E. Financial measures

Define and use financial measures, including revenue growth, market share, margin, cost of poor quality (COPQ), net present value (NPV), return on investment (ROI), cost benefit analysis, etc. (Apply)

 

 

III. Team facilitation and Dynamics

1. Team motivation

Describe and apply techniques that motivate team members and support and sustain their participation and commitment. (Apply)

2. Team stages

Facilitate the team through the classic stages of development: forming, storming, norming, performing and adjourning. (Apply)

3. Team communication

Identify and use appropriate communication methods (both within the team and from the team to various stakeholders) to report progress, conduct milestone reviews and support the overall success of the project. (Apply)

 

Identify and use various techniques (e.g., coaching, mentoring, intervention, etc.) to overcome various group dynamic challenges, including overbearing/dominant or reluctant participants, feuding and other forms of unproductive disagreement, unquestioned acceptance of opinions as facts, group-think, floundering, rushing to accomplish or finish, digressions, tangents, etc. (Evaluate)

Define, select and use tools such as brainstorming, nominal group technique, multi-voting, Pugh Matrix etc. (Apply)

Define, select and apply the following tools: affinity diagrams, tree diagrams, process decision program charts (PDPC), matrix diagrams, interrelationship digraphs, prioritization matrices and activity network diagrams. (Apply)

 

IV. Define 

A. Voice of the customer

1. Customer identification

Segment customers for each project and show how the project will impact both internal and external customers. (Apply)

2. Customer feedback

Identify and select the appropriate data collection method (surveys, focus groups, interviews, observation, etc.) to gather customer feedback to better understand customer needs, expectations and requirements. Ensure that the instruments used are reviewed for validity and reliability to avoid introducing bias or ambiguity in the responses. (Apply)

3. Customer requirements

Define, select and use appropriate tools to determine customer requirements, such as CTQ flow-down, quality function deployment (QFD) and the Kano model. (Apply)

B. Project charter

1. Problem statement

Develop and evaluate the problem statement in relation to the project’s baseline performance and improvement goals. (Create)

2. Project scope

Develop and review project boundaries to ensure that the project has value to the customer. (Analyze)

3. Goals and objectives

 

Develop the goals and objectives for the project on the basis of the problem statement and scope. (Apply)

4. Project performance measures

Identify and evaluate performance measurements (e.g., cost, revenue, schedule, etc.) that connect critical elements of the process to key outputs. (Analyze)

C. Project tracking

Identify, develop and use project management tools, such as schedules, Gantt charts, toll-gate reviews, etc., to track project progress.

Also see Project Management.

(Create)

 

 

V. Measure 

A. Process characteristics

1. Input and output variables

Identify these process variables and evaluate their relationships using SIPOC and other tools. (Evaluate)

2. Process flow metrics

Evaluate process flow and utilization to identify waste and constraints by analyzing work in progress (WIP), work in queue (WIQ), touch time, takt time, cycle time, throughput, etc. (Evaluate)

3. Process analysis tools

Analyze processes by developing and using value stream maps, process maps, flowcharts, procedures, work instructions, spaghetti diagrams, circle diagrams, etc. (Analyze)

B. Data collection

1. Types of data

Define, classify and evaluate qualitative and quantitative data, continuous (variables) and discrete (attributes) data and convert attributes data to variables measures when appropriate. (Evaluate)

2. Measurement scales

Define and apply nominal, ordinal, interval and ratio measurement scales. (Apply)

3. Sampling methods

Define and apply the concepts related to sampling (e.g., representative selection, homogeneity, bias, etc.).

Select and use appropriate sampling methods (e.g., random sampling, stratified sampling, systematic sampling, etc.) that ensure the integrity of data. (Evaluate)

4. Collecting data

Develop data collection plans, including consideration of how the data will be collected (e.g., check sheets, data coding techniques, automated data collection, etc.) and how it will be used. (Apply)

C. Measurement systems

1. Measurement methods

Define and describe measurement methods for both continuous and discrete data. (Understand)

2. Measurement systems analysis

Use various analytical methods (e.g., repeatability and reproducibility (R&R), correlation, bias, linearity, precision to tolerance, percent agreement, etc.) to analyze and interpret measurement system capability for variables and attributes measurement systems. (Evaluate)

3. Measurement systems in the enterprise

Identify how measurement systems can be applied in marketing, sales, engineering, research and development (R&D), supply chain management, customer satisfaction and other functional areas. (Understand)

4. Metrology

Define and describe elements of metrology, including calibration systems, traceability to reference standards, the control and integrity of standards and measurement devices, etc. (Understand)

D. Basic statistics

1. Basic terms

Define and distinguish between population parameters and sample statistics (e.g., proportion, mean, standard deviation, etc.) (Apply)

2. Central limit theorem

Describe and use this theorem and apply the sampling distribution of the mean to inferential statistics for confidence intervals, control charts, etc. (Apply)

3. Descriptive statistics

Calculate and interpret measures of dispersion and central tendency and construct and interpret frequency distributions and cumulative frequency distributions. (Evaluate)

4. Graphical methods

Construct and interpret diagrams and charts, including box-and-whisker plots, run charts, scatter diagrams, histograms, normal probability plots, etc. (Evaluate)

5. Valid statistical conclusions

Define and distinguish between enumerative (descriptive) and analytic (inferential) statistical studies and evaluate their results to draw valid conclusions. (Evaluate)

E. Probability Distributions

1. Basic concepts

Describe and apply probability concepts such as independence, mutually exclusive events, multiplication rules, complementary probability, joint occurrence of events, etc. (Apply)

2. Commonly used distributions

Describe, apply and interpret the following distributions: normal, Poisson, binomial, chi square, Student’s t and F distributions. (Evaluate)

3. Other distributions

Describe when and how to use the following distributions: hypergeometric, bivariate, exponential, lognormal and Weibull. (Apply)

F. Process capability

1. Process capability indices

Define, select and calculate Cp and Cpk to assess process capability. (Evaluate)

2. Process performance indices

Define, select and calculate Pp, Ppk and Cpm to assess process performance. (Evaluate)

3. Short-term and long-term capability

Describe and use appropriate assumptions and conventions when only short-term data or attributes data are available and when long-term data are available. Interpret the relationship between long-term and short-term capability. (Evaluate)

4. Process capability for non-normal data

Identify non-normal data and determine when it is appropriate to use Box-Cox or other transformation techniques. (Apply)

5. Process capability for attributes data

Calculate the process capability and process sigma level for attributes data. (Apply)

6. Process capability studies

Describe and apply elements of designing and conducting process capability studies, including identifying characteristics and specifications, developing sampling plans and verifying stability and normality. (Evaluate)

7. Process performance vs. specification

Distinguish between natural process limits and specification limits, and calculate process performance metrics such as percent defective, parts per million (PPM), defects per million opportunities (DPMO), defects per unit (DPU), process sigma, rolled throughput yield (RTY), etc. (Evaluate)

 

VI. Analyze

A. Measuring and modeling relationships between variables

1. Correlation coefficient

Calculate and interpret the correlation coefficient and its confidence interval, and describe the difference between correlation and causation. (Analyze) NOTE: Serial correlation will not be tested.

2. Regression

Calculate and interpret regression analysis, and apply and interpret hypothesis tests for regression statistics. Use the regression model for estimation and prediction, analyze the uncertainty in the estimate, and perform a residuals analysis to validate the model. (Evaluate) NOTE: Models that have non-linear parameters will not be tested.

  • Linear Regression

  • Logisitic Regression

  • Multiple Linear Regression

3. Multivariate tools

Use and interpret multivariate tools such as principal components, factor analysis, discriminant analysis, multiple analysis of variance (MANOVA), etc., to investigate sources of variation. (Analyze)

4. Multi-vari studies

Use and interpret charts of these studies and determine the difference between positional, cyclical and temporal variation. (Analyze)

5. Attributes data analysis

Analyze attributes data using logit, probit, logistic regression, etc., to investigate sources of variation. (Analyze)

B. Hypothesis testing

1. Terminology

Define and interpret the significance level, power, type I and type II errors of statistical tests. (Evaluate)

2. Statistical vs. practical significance

Define, compare and interpret statistical and practical significance. (Evaluate)

3. Sample size

Calculate sample size for common hypothesis tests (e.g., equality of means, equality of proportions, etc.). (Apply)

4. Point and interval estimates

Define and distinguish between confidence and prediction intervals. Define and interpret the efficiency and bias of estimators. Calculate tolerance and confidence intervals. (Evaluate)

5. Tests for means, variances and proportions

Use and interpret the results of hypothesis tests for means, variances and proportions. (Evaluate)

6. Analysis of variance (ANOVA)

Select, calculate and interpret the results of ANOVAs. (Evaluate)

7. Goodness-of-fit (chi square) tests

Define, select and interpret the results of these tests. (Evaluate)

8. Contingency tables Select, develop and use contingency tables to determine statistical significance. (Evaluate)

9. Non-parametric tests

Select, develop and use various non-parametric tests, including Mood’s Median, Levene’s test, Kruskal-Wallis, Mann-Whitney, etc. (Evaluate)

C. Failure mode and effects analysis (FMEA)

Describe the purpose and elements of FMEA, including risk priority number (RPN), and evaluate FMEA results for processes, products and services.

Distinguish between design FMEA (DFMEA) and process FMEA (PFMEA), and interpret results from each. (Evaluate)

D. Additional analysis methods

1. Gap analysis

Use various tools and techniques (gap analysis, scenario planning, etc.) to compare the current and future state in terms of pre-defined metrics. (Analyze)

2. Root cause analysis

Define and describe the purpose of root cause analysis, recognize the issues involved in identifying a root cause, and use various tools (e.g., the 5 whys, Pareto charts, fault tree analysis, cause and effect diagrams, etc.) for resolving chronic problems. (Evaluate)

3. Waste analysis

Identify and interpret the 7 classic wastes (overproduction, inventory, defects, over-processing, waiting, motion and transportation) and other forms of waste such as resource under-utilization, etc. (Analyze)

E. Design of experiments (DOE)

1. Terminology

Define basic DOE terms, including independent and dependent variables, factors and levels, response, treatment, error, etc. (Understand)

2. Design principles

Define and apply DOE principles, including power and sample size, balance, repetition, replication, order, efficiency, randomization, blocking, interaction, confounding, resolution, etc. (Apply)

3. Planning experiments

Plan, organize and evaluate experiments by determining the objective, selecting factors, responses and measurement methods, choosing the appropriate design, etc. (Evaluate)

4. One-factor experiments

Design and conduct completely randomized, randomized block and Latin square designs and evaluate their results. (Evaluate)

5. Two-level fractional factorial experiments

Design, analyze and interpret these types of experiments and describe how confounding affects their use. (Evaluate)

6. Full factorial experiments

Design, conduct and analyze full factorial experiments. (Evaluate)

 

 

VII. Improve 

 

A. Waste elimination

Select and apply tools and techniques for eliminating or preventing waste, including pull systems, kanban, 5S, standard work, poka-yoke, etc. (Analyze)

B. Cycle-time reduction

Use various tools and techniques for reducing cycle time, including continuous flow, single-minute exchange of die (SMED), etc. (Analyze)

C. Kaizen and kaizen blitz

Define and distinguish between these two methods and apply them in various situations. (Apply)

D. Theory of constraints (TOC)

Define and describe this concept and its uses. (Understand)

E. Implementation

Develop plans for implementing the improved process (i.e., conduct pilot tests, simulations, etc.), and evaluate results to select the optimum solution. (Evaluate)

 

VIII. Control 

A. Statistical process control (SPC)

1. Objectives

Define and describe the objectives of SPC, including monitoring and controlling process performance, tracking trends, runs, etc., and reducing variation in a process. (Understand)

2. Selection of variables

Identify and select critical characteristics for control chart monitoring. (Apply)

3. Rational subgrouping

Define and apply the principle of rational subgrouping. (Apply)

4. Control chart selection

Select and use the following control charts in various situations: X¯ – R, X¯ – s, individual and moving range (ImR), attribute charts (p, np, c, u), short-run SPC and moving average. (Apply)

5. Control chart analysis

Interpret control charts and distinguish between common and special causes using rules for determining statistical control. (Analyze)

B. Other control tools

1. Total productive maintenance (TPM)

Define the elements of TPM and describe how it can be used to control the improved process. (Understand)

2. Visual factory

Define the elements of a visual factory and describe how they can help control the improved process. (Understand)

C. Maintain controls

1. Measurement system re-analysis

Review and evaluate measurement system capability as process capability improves, and ensure that measurement capability is sufficient for its intended use. (Evaluate)

2. Control plan

Develop a control plan for ensuring the ongoing success of the improved process including the transfer of responsibility from the project team to the process owner. 

 

 

 